Close
The page header's logo
Boeing Images 
Cart (0)
Login / Register
0
Selected 
Invert selection
Deselect all
Deselect all
 Click here to refresh results
 Click here to refresh results
Go to Login page
 Hide details
play button
Conceptually similar
787 Dreamliner Static Test Rollout
787 Dreamliner Static Test Rollout 
Fifth 787 Dreamliner Comes Together at Boeing's Everett Factory
Fifth 787 Dreamliner Comes Together at Boeing's Everett Factory 
787 Dreamliner factory production
787 Dreamliner factory production 
787 Dreamliner factory production
787 Dreamliner factory production 
787 Dreamliner factory production
787 Dreamliner factory production 
787 Dreamliner factory production
787 Dreamliner factory production 
787 Dreamliner Wing Join
787 Dreamliner Wing Join 
787 Dreamliner Production Line
787 Dreamliner Production Line 
787 Dreamliner Stress Testing
787 Dreamliner Stress Testing 
Final Assembly Begins on First Boeing 787 Dreamliner
Final Assembly Begins on First Boeing 787 Dreamliner 
787 Dreamliner Static Test
787 Dreamliner Static Test 
Final Assembly Begins on Fifth Boeing 787 Dreamliner
Final Assembly Begins on Fifth Boeing 787 Dreamliner 
Boeing Celebrates Rollout of 787 Dreamliner
Boeing Celebrates Rollout of 787 Dreamliner 
Boeing Factory Full with 787 Dreamliners
Boeing Factory Full with 787 Dreamliners 
Fifth 787 Dreamliner Flight Test Aircraft
Fifth 787 Dreamliner Flight Test Aircraft 
787 Dreamliner Production Line
787 Dreamliner Production Line 
Boeing Celebrates Rollout of 787 Dreamliner
Boeing Celebrates Rollout of 787 Dreamliner 
787 Dreamliner Landing Gear Swing Test
787 Dreamliner Landing Gear Swing Test 
787 Power Up Activity
787 Power Up Activity 
787 Dreamliner Tail Plane and Horizontal Stabilizer
787 Dreamliner Tail Plane and Horizontal Stabilizer 
Action button
Similar tones
similar-image
similar-image
similar-image
similar-image
similar-image
similar-image
similar-image
similar-image
similar-image
similar-image
View images with similar tones
Action button

787 Dreamliner Departs Factory

On June 20, 2008, Boeing moved the 787 Dreamliner designated for fatigue testing from the final assembly factory in Everett, Washington, to another production bay at the facility, where assembly work was to continue. The move paved the way for the second flight-test airplane to advance to the next position in the production line. The first Dreamliner remained in the nose-to-door position and the third flight-test airplane was in the first position. It remained there until the fourth flight-test airplane was ready for assembly to begin later the same month.
 Add to lightbox
 Add to cart
Unique identifier BI230929 
Boeing ID k64466 
Type Image 
Size 3613px × 2400px   24MB 
License type RM 
Keywords
2000s
airplanes
blue skies
buildings
commercial
commercial passenger planes
currently in production
day
exteriors
factories
ground shots
hangars
high altitude testing
jets
left front views
left side views
manufacturing
monoplanes
photos
several/groups
sunshine
tarmac
three-quarter length views
towing
unpainted
yellow
Restrictions