Close
The page header's logo
Boeing Images 
Cart (0)
Login / Register
0
Selected 
Invert selection
Deselect all
Deselect all
 Click here to refresh results
 Click here to refresh results
Go to Login page
 Hide details
play button
Conceptually similar
Final Assembly Begins on First Boeing 787 Dreamliner
Final Assembly Begins on First Boeing 787 Dreamliner 
Final Assembly Begins on First Boeing 787 Dreamliner
Final Assembly Begins on First Boeing 787 Dreamliner 
Final Assembly Begins on Another Boeing 787 Dreamliner
Final Assembly Begins on Another Boeing 787 Dreamliner 
Final Assembly Begins on First Boeing 787 Dreamliner
Final Assembly Begins on First Boeing 787 Dreamliner 
first 787-9 Dreamliner Begins Final Assembly
first 787-9 Dreamliner Begins Final Assembly 
787-8 Dreamliner final assembly facility in Everett
787-8 Dreamliner final assembly facility in Everett 
787 Dreamliner Production Line
787 Dreamliner Production Line 
Fifth 787 Dreamliner Flight Test Aircraft
Fifth 787 Dreamliner Flight Test Aircraft 
Boeing Employees Inside the Fifth 787 Dreamliner
Boeing Employees Inside the Fifth 787 Dreamliner 
Fifth 787 Dreamliner Comes Together at Boeing's Everett Factory
Fifth 787 Dreamliner Comes Together at Boeing's Everett Factory 
787 Dreamliner Departs Factory
787 Dreamliner Departs Factory 
First 787 Dreamliner on the Assembly Line
First 787 Dreamliner on the Assembly Line 
Boeing 787-8 Assembly Line in Everett, WA
Boeing 787-8 Assembly Line in Everett, WA 
Boeing Celebrates Rollout of 787 Dreamliner
Boeing Celebrates Rollout of 787 Dreamliner 
787 Dreamliner Tail Plane and Horizontal Stabilizer
787 Dreamliner Tail Plane and Horizontal Stabilizer 
Boeing 787-8 Assembly Line in Everett, WA
Boeing 787-8 Assembly Line in Everett, WA 
Boeing Factory Full with 787 Dreamliners
Boeing Factory Full with 787 Dreamliners 
787 Dreamliner Nose
787 Dreamliner Nose 
Boeing Celebrates Rollout of 787 Dreamliner
Boeing Celebrates Rollout of 787 Dreamliner 
787 Dreamliner Stress Testing
787 Dreamliner Stress Testing 
Action button
Similar tones
similar-image
similar-image
similar-image
similar-image
similar-image
similar-image
similar-image
similar-image
similar-image
similar-image
View images with similar tones
Action button

Final Assembly Begins on Fifth Boeing 787 Dreamliner

On May 1, 2008 final assembly began on the fifth Boeing 787 Dreamliner. This aircraft will be the third flight test airplane for the 787 program. After assembly is complete, this airplane will be fitted with an interior as part of the comprehensive flight-test program and certification process. Two of the first five 787 airframes will be used for static tests and fatigue tests. 
 Add to lightbox
 Add to cart
Unique identifier BI228617 
Boeing ID k64375 
Type Image 
Size 3300px × 2640px   24MB 
License type RM 
Keywords
2000s
airplanes
blue
commercial passenger planes
currently in production
factories
full body views
gray
ground shots
head on views
high altitude testing
interiors
jets
left front views
manufacturing
monoplanes
photos
several/groups
unpainted
viewed from above
Restrictions