Close
The page header's logo
Boeing Images 
Cart (0)
Login / Register
0
Selected 
Invert selection
Deselect all
Deselect all
 Click here to refresh results
 Click here to refresh results
Go to Login page
 Hide details
play button
Conceptually similar
Boeing 787 Dreamliner Moves to Fuel Dock
Boeing 787 Dreamliner Moves to Fuel Dock 
Boeing Employees Inside the Fifth 787 Dreamliner
Boeing Employees Inside the Fifth 787 Dreamliner 
Boeing Completes Intermediate Gauntlet Testing on the 787 Dreamliner
Boeing Completes Intermediate Gauntlet Testing on the 787 Dreamliner 
Nose Section of the 787 Dreamliner
Nose Section of the 787 Dreamliner 
Final Assembly Begins on First Boeing 787 Dreamliner
Final Assembly Begins on First Boeing 787 Dreamliner 
Boeing Completes Side-of-Body Installations on Two More 787 Dreamliners
Boeing Completes Side-of-Body Installations on Two More 787 Dreamliners
787 Dreamliner First Engine Run
787 Dreamliner First Engine Run 
Boeing Completes 787 Dreamliner High-Speed Taxi Test
Boeing Completes 787 Dreamliner High-Speed Taxi Test 
Early 787 Production Line in March 2009
Early 787 Production Line in March 2009 
The Fourth 787 Leaving the Assembly Line
The Fourth 787 Leaving the Assembly Line 
The Fourth 787 Enters Paint Facility
The Fourth 787 Enters Paint Facility 
First 787 Dreamliner on the Assembly Line
First 787 Dreamliner on the Assembly Line 
787 Dreamliner in Static Test Frame
787 Dreamliner in Static Test Frame 
Final Assembly Begins on First Boeing 787 Dreamliner
Final Assembly Begins on First Boeing 787 Dreamliner 
Final Assembly Begins on First Boeing 787 Dreamliner
Final Assembly Begins on First Boeing 787 Dreamliner 
ANA Pilots First Customer Crew to Fly Boeing 787 Dreamliner
ANA Pilots First Customer Crew to Fly Boeing 787 Dreamliner 
Side-of-Body Installations Complete on First Boeing 787 Dreamliner
Side-of-Body Installations Complete on First Boeing 787 Dreamliner 
Boeing Celebrates Rollout of 787 Dreamliner
Boeing Celebrates Rollout of 787 Dreamliner 
Boeing Factory Full with 787 Dreamliners
Boeing Factory Full with 787 Dreamliners 
Dreamliner Number 5 on the Boeing Production Line
Dreamliner Number 5 on the Boeing Production Line 
Action button
Similar tones
similar-image
similar-image
similar-image
similar-image
similar-image
similar-image
similar-image
similar-image
similar-image
similar-image
View images with similar tones
Action button

Boeing 787 Dreamliner Moves From the Paint Hangar to the Fuel Dock

On May 3, 2009 the all-new Boeing 787 Dreamliner was moved to the flight line. Fuel testing -- the first in the next phase of extensive checks the airplane must undergo -- was scheduled to begin in the next few days. In the weeks preceding the move to the fuel line, the 787 (designated ZA001) completed a rigorous series of tests including build verification tests, structures and systems integration tests, landing gear swings and factory gauntlet, which is the full simulation of the first flight using the actual airplane. Now on the flight line, ZA001 will undergo additional airplane power and systems tests as well as engine runs. After completing final systems checks and high-speed taxi tests, the airplane will be ready for first flight. 
 Add to lightbox
 Add to cart
Unique identifier BI231431 
Boeing ID k64686-1 
Type Image 
Size 3600px × 2400px   24MB 
License type RM 
Keywords
2000s
airplanes
blue
buildings
clouds
commercial
commercial passenger planes
currently in production
day
exteriors
full body views
gray
ground shots
hangars
high altitude testing
inspecting
jets
monoplanes
perspective lines
photos
right front views
several/groups
stairs, lifts and ladders
sunshine
tarmac
testing
text
white
Restrictions