Close
Boeing Images
Cart (0)
Login / Register
0
Selected
Invert selection
Deselect all
Deselect all
Click here to refresh results
Click here to refresh results
Go to Login page
Hide details
Conceptually similar
Boeing 787 Dreamliner Moves to Fuel Dock
Boeing Completes Intermediate Gauntlet Testing on the 787 Dreamliner
Boeing Employees Inside the Fifth 787 Dreamliner
Final Assembly Begins on First Boeing 787 Dreamliner
Nose Section of the 787 Dreamliner
Boeing Completes Side-of-Body Installations on Two More 787 Dreamliners
Early 787 Production Line in March 2009
787 Dreamliner First Engine Run
Boeing Completes 787 Dreamliner High-Speed Taxi Test
Final Assembly Begins on First Boeing 787 Dreamliner
The Fourth 787 Enters Paint Facility
First 787 Dreamliner on the Assembly Line
The Fourth 787 Leaving the Assembly Line
787 Dreamliner in Static Test Frame
Final Assembly Begins on First Boeing 787 Dreamliner
ANA Pilots First Customer Crew to Fly Boeing 787 Dreamliner
Side-of-Body Installations Complete on First Boeing 787 Dreamliner
Boeing Celebrates Rollout of 787 Dreamliner
Dreamliner Number 5 on the Boeing Production Line
Boeing Factory Full with 787 Dreamliners
Similar tones
View images with similar tones
Boeing 787 Dreamliner Moves From the Paint Hangar to the Fuel Dock
On May 3, 2009 the all-new Boeing 787 Dreamliner was moved to the flight line. Fuel testing -- the first in the next phase of extensive checks the airplane must undergo -- was scheduled to begin in the next few days. In the weeks preceding the move to the fuel line, the 787 (designated ZA001) completed a rigorous series of tests including build verification tests, structures and systems integration tests, landing gear swings and factory gauntlet, which is the full simulation of the first flight using the actual airplane. Now on the flight line, ZA001 will undergo additional airplane power and systems tests as well as engine runs. After completing final systems checks and high-speed taxi tests, the airplane will be ready for first flight.
Add to lightbox
Add to cart
Unique identifier
BI231431
Boeing ID
k64686-1
Size
3600px × 2400px 24MB
License type
RM
Keywords
2000s
airplanes
blue
buildings
clouds
commercial
commercial passenger planes
currently in production
day
exteriors
full body views
gray
ground shots
hangars
high altitude testing
inspecting
jets
monoplanes
perspective lines
photos
right front views
several/groups
stairs, lifts and ladders
sunshine
tarmac
testing
text
white
Restrictions
Manage crops
NAME
RATIO
Square
1 : 1
Portrait
2 : 3
Landscape
3 : 2