Close
The page header's logo
Boeing Images 
Cart (0)
Login / Register
0
Selected 
Invert selection
Deselect all
Deselect all
 Click here to refresh results
 Click here to refresh results
Go to Login page
 Hide details
play button
Conceptually similar
787 Power Up Activity
787 Power Up Activity 
787 Dreamliner factory production
787 Dreamliner factory production 
787 Dreamliner factory production
787 Dreamliner factory production 
787 Dreamliner factory production
787 Dreamliner factory production 
787 Dreamliner factory production
787 Dreamliner factory production 
787 Factory Heavy Moving Equipment
787 Factory Heavy Moving Equipment 
Boeing Celebrates Rollout of 787 Dreamliner
Boeing Celebrates Rollout of 787 Dreamliner 
787 Dreamliner Departs Factory
787 Dreamliner Departs Factory 
Boeing Unveils 787 Dreamliner Gallery
Boeing Unveils 787 Dreamliner Gallery 
787 Exits Factory in April 2010.
787 Exits Factory in April 2010. 
787 Dreamliner Landing Gear Swing Test
787 Dreamliner Landing Gear Swing Test 
Boeing Factory Full with 787 Dreamliners
Boeing Factory Full with 787 Dreamliners 
Fifth 787 Dreamliner Comes Together at Boeing's Everett Factory
Fifth 787 Dreamliner Comes Together at Boeing's Everett Factory 
Final Assembly Begins on First Boeing 787 Dreamliner
Final Assembly Begins on First Boeing 787 Dreamliner 
First 787 Dreamliner on the Assembly Line
First 787 Dreamliner on the Assembly Line 
Boeing Worker with Factory Transportation Equipment
Boeing Worker with Factory Transportation Equipment 
787 Line Robotic Handling Equipment
787 Line Robotic Handling Equipment 
787 Line Heavy Moving Equipment
787 Line Heavy Moving Equipment 
Nose Section of the 787 Dreamliner
Nose Section of the 787 Dreamliner 
787 Line Robotic Handling Equipment
787 Line Robotic Handling Equipment 
Action button
Similar tones
similar-image
similar-image
similar-image
similar-image
similar-image
View images with similar tones
Action button

787 Factory Power Up

A Boeing test technician plugs an external power cart into the first 787 Dreamliner as part of the Power-On testing sequence. Testing lasted just over one week and demonstrated the distribution, conversion, control and consumption of electric power on board the airplane. Completion also verifies the accuracy of the installation of systems on the first 787 and is an important step toward preparing for first flight in 2008. 
 Add to lightbox
 Add to cart
Unique identifier BI229305 
Boeing ID k64465-05 
Type Image 
Size 3300px × 2640px   24MB 
License type RM 
Keywords
2000s
adults
airplanes
blond hair
blue
candids
close-ups
commercial
commercial passenger planes
currently in production
factories
glare
ground shots
headphones
high altitude testing
hoses
interiors
jets
looking up
male
monoplanes
occupations and work
one person
photos
plugs & connectors
power up
service panels
smiling
structural systems
testing
Restrictions