Close
Boeing Images
Cart (0)
Login / Register
0
Selected
Invert selection
Deselect all
Deselect all
Click here to refresh results
Click here to refresh results
Go to Login page
Hide details
Conceptually similar
787 Line Heavy Moving Equipment
787 Line Heavy Moving Equipment
787 Factory Heavy Moving Equipment
787 Line Moving Assembly Equipment
787 Line Moving Assembly Equipment
787 Line Moving Assembly Equipment
787 Line Moving Assembly Equipment
787 Line Moving Assembly Equipment
787 Line Moving Assembly Equipment
787 Line Moving Assembly Equipment
787 Line Robotic Handling Equipment
Boeing Worker with 787 Line Moving Assembly Equipment
787 Line Moving Assembly Equipment with Boeing Worker
787 Line Robotic Handling Equipment
787 Line Robotic Handling Equipment
Boeing Worker with 787 Line Transportation Equipment
787 Dreamliner Production Line
Boeing 787-8 Assembly Line in Everett, WA
Boeing 787-8 Assembly Line in Everett, WA
The 787-8 Temporary Surge Line in Everett, WA, April 2013
Similar tones
View images with similar tones
787 Line Heavy Moving Equipment
The 787 production system was designed using Lean manufacturing techniques in a simplified final assembly process. Portable tools, designed with ergonomics in mind, move the assemblies into place. No overhead cranes are used to move airplane structure.
Add to lightbox
Add to cart
Unique identifier
BI227639
Boeing ID
han2016
Type
Image
Size
4288px × 2848px 34MB
License type
RM
Keywords
2000s
airplanes
commercial
commercial passenger planes
currently in production
factories
full body views
gray
ground shots
high altitude testing
interiors
jets
manufacturing
nobody
perspective lines
photos
repetition
text
white
yellow
Restrictions