Close
Boeing Images
Cart (0)
Login / Register
0
Selected
Invert selection
Deselect all
Deselect all
Click here to refresh results
Click here to refresh results
Go to Login page
Hide details
Conceptually similar
777 Moving Line Assembly
777 Moving Line Final Assembly
777 Moving Line Manufacturing
777 Moving Line Manufacturing
777 Moving Line Final Assembly
777 Moving Line Final Assembly
777 Moving Line Final Assembly
777 Moving Line Final Assembly
777-300ER Moving Line Assembly
777 Moving Line Final Assembly
Moving Line Assembly of 777-300ER
Moving Line Assembly 777-300ER
777 Moving Assembly Line
777 Moving Line Final Assembly
777 Moving Line Final Assembly
777 Moving Line Final Assembly
777 Station to Station Manufacturing, Everett Facility, circa 2005
777 Moving Line Final Assembly
777 Moving Line Final Assembly
777-200LR Worldliner in Paint Hangar for New Livery
Similar tones
View images with similar tones
777 Moving Line Final Assembly
On Nov. 8, 2006 The Boeing Company began using a moving assembly line for the first time to build its market-leading 777 jetliner. To make its 777 assembly line move during final assembly, Boeing uses a tug that attaches around the front landing gear of the airplane and pulls it forward. The tug has an optical sensor that follows a white line along the floor. During final assembly, mechanics install items such as seats, overhead stow bins and other items on the interior of the airplane. In addition, functional testing is performed on the various systems in the airplane and the engines are attached.
Add to lightbox
Add to cart
Unique identifier
BI221181
Boeing ID
k63744-04
Type
Image
Size
3748px × 2507px 26MB
License type
RM
Keywords
2000s
commercial passenger planes
currently in production
day
factories
final assembly
full body views
fuselages
gray
grid patterns
ground shots
head on views
interiors
jets
manufacturing
moving line
perspective lines
photos
rear views
stairs, lifts and ladders
structural systems
two people
unpainted
Restrictions