Close
Boeing Images
Cart (0)
Login / Register
0
Selected
Invert selection
Deselect all
Deselect all
Click here to refresh results
Click here to refresh results
Go to Login page
Hide details
Conceptually similar
Joint Strike Fighter X-32A on Tarmac
X-32A Joint Strike Fighter Concept Demonstrator on Tarmac
X-32A Joint Strike Fighter Concept Demonstrator on Tarmac
Joint Strike Fighter X-32A on Tarmac
Joint Strike Fighter X-32A on Tarmac
X-32A Joint Strike Fighter (JSF) Concept Demonstrator on Tarmac
X-32 Joint Strike Fighter Wind Tunnel Data
X-32A Joint Strike Fighter (JSF) Concept Demonstrator on Tarmac
X-32A Joint Strike Fighter Wave-Off Test
X-32 Joint Strike Fighter (JSF) Concept
X-32A Joint Strike Fighter Drops Munitions
Boeing X-32A Joint Strike Fighter Moves into Structural Test
X-32A Joint Strke Fighter on Aircraft Carrier
X-32A Joint Strike Fighter (JSF) Refueling in Flight
X-32A Joint Strike Fighter (JSF) Demo
X-32A Joint Strike Fighter (JSF) with Moonrise
X-32A Joint Strike Fighter in Flight
X-32A Joint Strike Fighter Landing Tests
X-32A Joint Strike Fighter Flight Test Landing
Boeing Installs Propulsion System in STOVL X-32B JSF Demonstrator
Similar tones
View images with similar tones
Boeing Demonstrates Lean Practices on Joint Strike Fighter
Palmdale, CA, June 14, 1999 -- The Joint Strike Fighter X-32A concept demonstrator has become a symbol of how Boeing is exploiting lean design and manufacturing techniques to produce affordable military aircraft. Three-dimensional solid modeling and assembly simulation, laser-guided part positioning and minimal tooling are some of the advanced approaches Boeing plans to carry forward into the next phase of the JSF program. Thanks to these and other "lean" concepts, overall X-32 fabrication and assembly costs remain at 30 to 40 percent below projections that are already low compared to previous aircraft development programs. Also, thanks largely to digital design processes, no unplanned shimming has been required in the assembly of the X-32A. Workers attached the X-32A wing to the fusel in late May, and subsystems installation and fit checks of the landing gear and vertical tails are underway. First flight is scheduled for Spring of 2000. Boeing is competing to build the JSF under a four-year joint U.S. Air Force, Navy and Marine Corps concept demonstration contract.
Add to lightbox
Add to cart
Unique identifier
BI228119
Boeing ID
r8zh
Type
Image
Size
3000px × 2400px 20MB
License type
RM
Keywords
airplanes
black
blue
factories
fighters
full body views
gray
ground shots
high-tech / advanced
historic production status
interiors
jets
left front views
left side views
manufacturing
military
monoplanes
nobody
photos
prototypes
stairs, lifts and ladders
technology demonstrators
text
unpainted
viewed from above
Restrictions