Close
The page header's logo
Boeing Images 
Cart (0)
Login / Register
0
Selected 
Invert selection
Deselect all
Deselect all
 Click here to refresh results
 Click here to refresh results
Go to Login page
 Hide details
play button
Conceptually similar
Boeing South Carolina 787 Dreamliner Assembly Line, 2014
Boeing South Carolina 787 Dreamliner Assembly Line, 2014 
Solar Panels on Roof of Boeing South Carolina 787 Final Assembly Building
Solar Panels on Roof of Boeing South Carolina 787 Final Assembly Building 
Boeing South Carolina Facility
Boeing South Carolina Facility 
Boeing 787-10 in Assembly at Boeing South Carolina
Boeing 787-10 in Assembly at Boeing South Carolina 
Boeing South Carolina 787-8 Facility August 2011
Boeing South Carolina 787-8 Facility August 2011 
Boeing South Carolina 787-8 Final Assembly, May 2013
Boeing South Carolina 787-8 Final Assembly, May 2013 
Boeing 787-10 in Assembly at Boeing South Carolina
Boeing 787-10 in Assembly at Boeing South Carolina 
Boeing 787-10 in Assembly at Boeing South Carolina
Boeing 787-10 in Assembly at Boeing South Carolina 
Boeing South Carolina Begins Final Assembly of its First 787-9, November 2014
Boeing South Carolina Begins Final Assembly of its First 787-9, November 2014 
Boeing 787-10 in Assembly at Boeing South Carolina
Boeing 787-10 in Assembly at Boeing South Carolina 
Boeing Charleston 787 Assembly Facility, August 2011
Boeing Charleston 787 Assembly Facility, August 2011 
Boeing South Carolina
Boeing South Carolina 
First South Carolina-built 787 moves to Final Assembly Position 3
First South Carolina-built 787 moves to Final Assembly Position 3 
Boeing Charleston Facility Under Construction.
Boeing Charleston Facility Under Construction. 
787-8 Dreamliners on Boeing South Carolina flight Line
787-8 Dreamliners on Boeing South Carolina flight Line 
Boeing Charleston, SC Assembly Facility Takes Shape
Boeing Charleston, SC Assembly Facility Takes Shape 
Boeing South Carolina Building 88-19
Boeing South Carolina Building 88-19 
Aerial View of Boeing North Charleston Factory
Aerial View of Boeing North Charleston Factory 
Boeing South Carolina's Second Autoclave Moves into Position
Boeing South Carolina's Second Autoclave Moves into Position 
Moving Boeing South Carolina's Second Autoclave into Position
Moving Boeing South Carolina's Second Autoclave into Position 
Action button
Similar tones
similar-image
similar-image
similar-image
similar-image
similar-image
similar-image
similar-image
View images with similar tones
Action button

Solar Panels Atop Boeing South Carolina Facility

In October 2009, Boeing selected the North Charleston site for the second 787 Dreamliner assembly line. Boeing broke ground on a new, 1.2-million-square-foot (92,903-m2) final assembly and delivery facility in December 2009. Boeing South Carolina performs final assembly and delivers 787s from North Charleston to customers around the world. 
 Add to lightbox
 Add to cart
Unique identifier BI232309 
Boeing ID k65435-02 
Type Image 
Size 3300px × 2232px   21MB 
License type RM 
Keywords
aerial views
blue
day
exteriors
factories
gray
grid patterns
high-tech / advanced
large
manufacturing
nobody
perspective lines
photos
repetition
shadows
solar panels
sunshine
symmetry
viewed from above
white
Restrictions