Close
Boeing Images
Cart (0)
Login / Register
0
Selected
Invert selection
Deselect all
Deselect all
Click here to refresh results
Click here to refresh results
Go to Login page
Hide details
Linked assets
KC-46A Pegasus
Conceptually similar
Boeing 767-2C First Flight B-roll, December 28, 2014
First KC-46A for a non-US customer (Japan) gives and receives fuel with another KC-46A
Boeing B-52A Stratofortress B-roll, 1950s
Boeing YB-52 Stratofortress B-roll
B-29 Superfortress at Boeing Field During World War II
Testing the 747-100 Prior to First Flight, 1969
KC-135 Stratotanker Rollout and First Flight, 1956
Boeing Model 367-80 "Dash 80" Rollout and Pre-Flight Testing
Boeing Model 307 Stratoliner Development Testing
First Flight of the 747-100, February 9, 1969
Boeing B-47 Stratojet B-roll
367-80 Aerial Refueling Tests
Boeing B-9 Bomber B-roll
Boeing P-26 Peashooter B-roll (includes Boeing B-9)
Boeing B-17 Flying Fortress B-roll (Color)
Boeing 747 Advanced Cargo Transport Aircraft (KC-33)
Boeing 707 First Flight- Post Flight
Boeing 787-9 Dreamliner First Flight, September 2014
KC-97 Stratofreighter Refuels B-47 and B-52
Boeing B-17 Flying Fortress Factory B-roll (Color)
Boeing KC-46A Pegasus First Flight B-roll
The Boeing and U.S. Air Force team successfully completed the first flight of a KC-46A tanker aircraft on September 25, 2015, from Paine Field, Everett, Wash. to Boeing Field, Seattle. This was the first flight of a KC-46A tanker-configured aircraft, following ongoing flights of the program’s first test aircraft, a 767-2C. During the four hour flight, Boeing test pilots performed operational checks on engines, flight controls and environmental systems and took the tanker to a maximum altitude of 35,000 feet prior to landing.
As part of a contract awarded in 2011 to design and develop the U.S. Air Force’s next-generation tanker aircraft, Boeing is building four test aircraft – two are currently configured as 767-2Cs and two KC-46A tankers. The KC-46s will fly as fully equipped tankers through the FAA and military certification process, while the 767-2Cs enter flight test prior to receiving their upgrade to the KC-46A configuration and the addition of their aerial refueling systems.
Add to lightbox
Add to cart
Unique identifier
BI46318
Boeing ID
BIV15_KC-46_03
Type
Video
Duration
1m59s
Size
1920px × 1080px 456MB
License type
RM
Keywords
2010s
air to air
clouds
copy space
day
exterior lights
first flights
flying
flying in formation
full body views
fuselages
gray
ground shots
high-tech / advanced
landing gears
large
military livery
perspective lines
production milestones
runways
takeoffs
tankers
taxiing
test flights
trees