Close
The page header's logo
Boeing Images 
Cart (0)
Login / Register
0
Selected 
Invert selection
Deselect all
Deselect all
 Click here to refresh results
 Click here to refresh results
Go to Login page
 Hide details
play button
Conceptually similar
Boeing Moving Line Begins for Production of 787 Vertical Fin
Boeing Moving Line Begins for Production of 787 Vertical Fin 
First 787 Dreamliner on the Assembly Line
First 787 Dreamliner on the Assembly Line 
787 Exits Factory in April 2010.
787 Exits Factory in April 2010. 
787 Line Moving Assembly Equipment
787 Line Moving Assembly Equipment 
787 Dreamliner Production Line
787 Dreamliner Production Line 
787 Dreamliner factory production
787 Dreamliner factory production 
787 Line Moving Assembly Equipment
787 Line Moving Assembly Equipment 
787 Parts Manufacturing in Austrailia
787 Parts Manufacturing in Austrailia 
787 Dreamliner factory production
787 Dreamliner factory production 
787 Dreamliner factory production
787 Dreamliner factory production 
787 Line Moving Assembly Equipment
787 Line Moving Assembly Equipment 
787 Dreamliner factory production
787 Dreamliner factory production 
787 Dreamliner Composite Barrel Joining
787 Dreamliner Composite Barrel Joining 
787 Assembly Line Turning Jigs and Platform Lift
787 Assembly Line Turning Jigs and Platform Lift 
787 Assembly Line in April 2010
787 Assembly Line in April 2010 
Boeing Worker with 787 Line Moving Assembly Equipment
Boeing Worker with 787 Line Moving Assembly Equipment 
787 Line Moving Assembly Equipment with Boeing Worker
787 Line Moving Assembly Equipment with Boeing Worker 
First South Carolina-built 787 moves to Final Assembly Position 3
First South Carolina-built 787 moves to Final Assembly Position 3 
Boeing Factory Full with 787 Dreamliners
Boeing Factory Full with 787 Dreamliners 
787 Power Up Activity
787 Power Up Activity 
Action button
Similar tones
similar-image
similar-image
similar-image
similar-image
similar-image
similar-image
similar-image
similar-image
similar-image
similar-image
View images with similar tones
Action button

787 Vertical Fin Fabrication - Tape Laydown Machine

Fabrication of the first composite stringers for the vertical fin on the 787 Dreamliner, Boeing's all new commercial airplane, began Sept. 13, 2006 at the Composite Manufacturing Center (CMC) at Boeing Frederickson in Pierce County, Wash. The vertical fin is the largest major Boeing 787 Dreamliner assembly built by an internal Boeing supplier. CMC plans to deliver its first fully functional vertical fin to 787 Final Assembly in Everett, Wash., in Spring 2007. Fabrication start of the 787 vertical fin began with the push of a button by Boeing CMC employee, Don Hall, flat tape laminating machine operator. The process involves laying down composite tape to build up a charge, with the part then formed on a tool and cured in a large autoclave prior to assembly. 
 Add to lightbox
 Add to cart
Unique identifier BI221575 
Boeing ID k63793-01 
Type Image 
Size 3000px × 2410px   20MB 
License type RM 
Keywords
adults
airplanes
blue
commercial passenger planes
currently in production
factories
factory workers
gray
ground shots
half-length views
high altitude testing
interiors
jets
male
manufacturing
occupations and work
one person
photos
right side views
white
Restrictions